Welcome to NepalHRM.
This guide walks you through your first 7 days on the platform, and the 30 days of hypercare after. Read it once end-to-end before kickoff so you know what to expect — then keep it open as a checklist through the week.
What to expect
1. Kickoff call within 2 working days of signing.
2. 7 days from kickoff to your first live payroll run.
3. 30 days of dedicated hypercare with WhatsApp access to your implementation lead.
4. Free: setup, training, import, biometric pairing, payroll dry run.
5. What we need from you: a single HR-side coordinator, a CSV of employees, and 90 minutes a day for the first week.
1. Your onboarding team
Two named people from us, two roles we'll need from you. No ticket queues during onboarding.
Implementation Lead
Your day-to-day point of contact. Runs the 7-day plan, sits with you on go-live, and stays on a WhatsApp channel through hypercare.
Active for 30 days post-kickoffCustomer Success Manager
Senior escalation point and your relationship owner long-term. Checks in at end of week 1, end of hypercare, then quarterly.
Active for the life of the accountHR Project Lead
Single point of decision-making on your side. Owns data preparation, attends every working session, validates each deliverable.
Active for 30 days, ~2 hrs/dayIT / Systems Contact
For biometric device pairing, network settings, SSO setup (if applicable), and the email-domain check for outbound payslips.
Active for week 1, ~3 hrs total2. Pre-kickoff checklist
Gather these before the kickoff call. Doing it ahead saves 2 days off the timeline.
Data & documents
3. Day 1 — Kickoff
Mostly a conversation. By the end of the day your workspace exists and your admin can log in.
Workspace provisioning & first sign-in
- Kickoff video call — review the 7-day plan, confirm dates, exchange WhatsApp numbers.
- NepalHRM team provisions your workspace on
app.nepalhrm.comwith your logo. - HR Project Lead gets the first admin invitation by email; signs in and sets a password.
- Together we configure: company legal name, PAN, address, timezone (Asia/Kathmandu by default), currency.
- 2nd admin invited (usually the IT contact).
- Data templates handed over: employee CSV, salary CSV, leave balance CSV.
app.nepalhrm.com, two admins active, three CSV templates in your shared folder.4. Day 2–3 — Data import & configuration
The biggest part of the week. The quality of these two days determines how smooth go-live is.
Employees & organisation structure
- HR fills the employee CSV from the prepared roster.
- Implementation Lead reviews the file, fixes column issues, runs the bulk import.
- Departments, designations, locations created.
- Reporting lines mapped — org chart auto-generates.
- A 5-row sample manually verified against your source-of-truth before bulk import.
Payroll structures, leave policies, attendance rules
- Salary structures defined: basic, allowances, deductions, PF (10% + 10%), CIT, SSF, festival bonus rule.
- Up to 5 structures supported in standard onboarding.
- Leave types, accrual rules, carry-forward and encashment configured.
- Opening leave balances imported from CSV.
- Holiday calendar populated.
- Attendance policies set: working hours, late grace, overtime rules.
- One sample employee's payroll calculated end-to-end and shown to HR Project Lead for sign-off.
5. Day 4 — Biometric devices
If you're using biometric attendance. Skip if your attendance is web/mobile-only.
Device pairing & shadow attendance
- IT confirms each biometric device is online and reachable.
- Device serial number added in NepalHRM → Devices & Mapping.
- Employees mapped to device IDs (usually their existing biometric employee number).
- "Unmapped employees" count must reach 0 before go-live.
- 24-hour shadow attendance run — punches flow into NepalHRM in parallel with your existing system. HR compares the next morning.
6. Day 5 — Training
Three sessions, recorded so you can re-use them with future hires.
Admin · Manager · Employee orientation
- Admin session (2 hrs) — HR Project Lead + admins. Covers payroll run, leaves approval, employee onboarding, audit log, reports. Hands-on, not slides.
- Manager session (1 hr) — All people managers. Covers approving leaves & overtime, viewing team attendance, performance reviews, helpdesk tickets.
- Employee orientation (45 min) — Recorded by NepalHRM, shareable to all employees. Mobile app, leave application, payslip download, helpdesk.
7. Day 6 — Payroll dry run
The most important day of the week. We reproduce last month's payroll inside NepalHRM and reconcile line by line.
Previous-month payroll dry run + reconciliation
- Create the payroll period for the previous month (already concluded).
- Run payroll — generates payslips, PF / CIT / SSF / eTDS files.
- Open both reports side by side: NepalHRM vs your existing system.
- Acceptable variance per employee: ± NPR 5 (rounding). Anything bigger gets investigated.
- Common causes of variance: missing salary component, rounding rule mismatch, leave-without-pay days mis-counted. Each fix recorded in the audit log.
- Sign-off when all employees match within tolerance.
8. Day 7 — Live payroll
Go-live day. Implementation Lead is on a call with you for the entire run.
First live monthly payroll
- Final attendance corrections applied (regularisations, leave approvals).
- Payroll period created, locked.
- Payroll run executed by HR (not by us — your team owns the button).
- Bank file generated and downloaded.
- PF / CIT / SSF / eTDS files exported, ready for portal upload.
- Payslips published; employees notified by email + push notification.
9. First 30 days — Hypercare
Concentrated support to lock in habits and surface anything that needs adjustment before your second payroll cycle.
What we do
- Dedicated WhatsApp channel with HR Project Lead + Implementation Lead.
- Daily check-in (5–10 min) for the first 7 days.
- Weekly review for weeks 2–4.
- 2nd payroll cycle supervised end-to-end.
- End-of-hypercare retro: what worked, what to change.
What we ask you to do
- Answer the daily check-in even if "all good" — silence breaks our radar.
- Route every question through HR Project Lead for the first 30 days, not directly to managers.
- Log issues in the in-app helpdesk so we build the audit trail.
- Block a 60-minute slot for the end-of-hypercare retro.
| Week | Focus | Typical activity |
|---|---|---|
| Week 1 | Land the basics | Daily attendance reconciled, first leave requests approved, helpdesk tickets opening and closing. |
| Week 2 | Edge cases | Resignations / new hires processed end-to-end, first reimbursement claim, first loan approved. |
| Week 3 | Reporting | HR Project Lead runs the standard reports unaided. Custom report requirements identified. |
| Week 4 | Second payroll | HR runs the full payroll without our hands on it; we sit on the call for safety. |
10. After hypercare — Steady state
Day 31 onwards. The WhatsApp channel closes; standard support opens.
What changes
- Support moves from WhatsApp to [email protected] and the in-app helpdesk.
- Response SLA: 4 working hours (Growth) / next-business-day (Scale).
- Customer Success Manager schedules a 30-day review call.
- Quarterly product review calls begin (Scale plan).
What stays the same
- Your workspace, your data, your branding — no change.
- Implementation Lead remains accessible for context questions during the first 90 days.
- Free training: any new HR hire gets a 1-hour onboarding session on us.
11. Common first-week issues
The patterns we see most often. If yours matches, jump to the fix; if not, ping us.
manager_id; if it's blank, they see nothing. HR Project Lead can fix this in Employees → Edit.12. Support channels
Pick the right channel for the urgency.
Group with your Implementation Lead. Fastest channel during the first 30 days. Closes at end of hypercare.
In-app helpdesk
Click the help icon → New ticket. Best for non-urgent issues that need a written record.
Phone (Scale plan)
Dedicated number shared after go-live. Reserve for P1: payroll-blocking or data-loss incidents.
13. URLs & logins to bookmark
Stick these in your team's shared bookmarks before the kickoff call.
| What | URL | For |
|---|---|---|
| Web app | https://app.nepalhrm.com | Admins, managers, HR — the main workspace. |
| Employee app — iOS | App Store · search "NepalHRM" | All employees for clock-in, leaves, payslips. |
| Employee app — Android | Play Store · search "NepalHRM" | All employees for clock-in, leaves, payslips. |
| Knowledge base | nepalhrm.com/help | Self-service guides, video walkthroughs. |
| Sales / commercial | [email protected] | Plan changes, add-ons, contracts. |
| Support | [email protected] | Help with day-to-day operations. |
14. Escalation path
If a ticket isn't moving fast enough, here's how to push it.
- Level 1 — Support agent. Default response on every ticket.
- Level 2 — Customer Success Manager. Reply to the ticket asking to escalate; CSM picks it up within 1 working hour.
- Level 3 — Engineering on-call. CSM brings in engineering for P1 (payroll-blocking, data-loss) incidents.
- Level 4 — Director of Customer Success. If you feel a P1 isn't getting due attention, email the Director directly (contact shared at signing).